ELEMENTS OF CONSTRUCTION

DETAILS

After the completion of the basic structure, work on the Sheerfill membrane began, The 24 three sectioned masts were sequentially installed and guyed into place (A).

A center ring (B), consisting of six 2 5/8" cables, was hydraulically jacked into position 140 ft. above the playing field (C). Here is a close up color photo of detail (C). Cables framing the inner fabric panels (D) were run up a tramway system and winched into place (E). The outer panels were hoisted up to their positions using a steel spreader beam and a 300-ton crane (F).

Adjacent panel edges were then mechanically clamped to the cables (G) to form the final enclosure (H). An increase in mast top elevation temsioned the panels into their design geometry (I). Fabric overlays covered the seams and decorative pinnacles were added to the masts (J).

In its final form, the King Fhad International Stadium serves as a source of pride and makes a grand statement in support of the spirit of athletic competition (K&L).

DETAILS

These are some details form other structures.

Edge cable connection to fabric.
Fabric cable clamp detail
Another design for fabric cable clamp detail
Two different deatils of anchorage for either low profile air supported or tension fabric structure
Air supported structure having cable harness system reinforcement